Commit Graph

14 Commits

Author SHA1 Message Date
James Murray fef25179d0 Added a Bibliography, fixed something in the Domain Researh pdf. 2017-12-04 01:03:50 -05:00
James Murray 9872cd1291 Added Domain Research document 2017-12-04 00:14:33 -05:00
joseph62 c5bf71cb26 Merged. 2017-12-03 23:32:18 -05:00
joseph62 f598c34566 Added a link to the second prototype. 2017-12-03 23:29:36 -05:00
James Murray 1a8237ea23 Standardized some things on the minutes page. 2017-12-03 23:21:26 -05:00
James Murray fd807dee6d Added Customer Questions/answers 2017-12-03 23:04:52 -05:00
James Murray 9d83ce9ad7 Added milestones and .docx files. 2017-12-03 22:46:51 -05:00
James Murray 20b9074755 Fixed about page to contain emails of the team. 2017-12-03 22:30:37 -05:00
joseph62 aa3e5d4e31 Added SRS V2 2017-11-29 21:03:08 -05:00
joseph62 25caf3e591 Added meeting 4 and 5 minutes.
Linked prototype on front page
2017-11-20 10:13:18 -05:00
joseph62 93e790895a Added SRS and Reqirements 2017-11-13 12:54:56 -05:00
joseph62 9a073edded added a link to the landing page. 2017-10-29 22:45:18 -04:00
joseph62 53d2ff7547 Added content to landing page and team page.
The secure website section needs to be reformatted
so that it has matching style along with the rest of the website.
2017-10-29 22:43:40 -04:00
joseph62 1c927a643b Added about page.
The assets directory should store any pictures that the site uses.
Removed lingering directory
2017-10-26 20:08:41 -04:00